Onyx Bugett | TalkLife News
November 18, 2026 | Morning edition
Archival neighborhood illustration: Brooklyn’s Central Library at Grand Army Plaza, August 2008. This photograph does not show the new bus lanes or current street layout. Photo: David Shankbone / Wikimedia Commons, CC BY-SA 3.0. Resized; image adaptations remain under the same license.
BROOKLYN — A newly completed section of protected, center-running bus lanes on Flatbush Avenue is changing how riders board and how traffic moves between Downtown Brooklyn and Grand Army Plaza. The project opened with a November 17 announcement, bringing an immediate street redesign while leaving the larger bus rapid transit program ahead.
The Mayor’s Office and Department of Transportation announced 1.9 miles of physically separated lanes and six concrete boarding islands. The administration identifies the B41, B67, B45 and B103 among the services using Flatbush Avenue and says the wider corridor serves 120,000 daily riders.
That corridor total is different from the number using the redesigned section. amNewYork reported from Tuesday’s ribbon-cutting that Transportation Commissioner Mike Flynn put that section’s ridership at more than 55,000 daily users. The distinction helps explain the scale of the work without implying every rider on Flatbush travels through the new lanes.
The design separates buses from general traffic and lets them serve boarding islands rather than repeatedly pulling into and out of the curb. Officials say that should reduce delays associated with congestion and double parking. Those expected benefits are the project’s purpose; the announcement does not provide a completed before-and-after performance study.
amNewYork interviewed an East Flatbush rider who believed service was already faster, but also described an adjustment: his usual stop moved up the block to a boarding island. That is one rider’s experience, rather than evidence of a measured improvement across every route or time of day.
The city also reports more pedestrian space, seating at boarding islands, new bike racks and updated signals. Revised loading areas and parking regulations are part of the redesign. For people walking to a bus or making deliveries, those changes make the layout consequential even when they are not riding.
DOT Commissioner Flynn said the agency would monitor the project over the coming months and make adjustments where needed. The administration describes this section as a first step toward bus rapid transit on Flatbush Avenue by 2030, rather than completion of the entire corridor.
For commuters, the immediate change is where buses travel and where passengers board. Riders should check the posted stop information and crossing layout instead of assuming their former curbside stop is unchanged. The test over time will be whether the protected space delivers more reliable trips to work, school and neighborhood destinations.
